Amphibious excavator “SWAMPKING”

“SWAMPKING” is designed and mounted on pontoon/usage move, which makes this machine a unique of a kind, truly — the King of Swamps!

Amphibious excavator “SWAMPKING” performs wide range of works on such hardly accessible sites as marshland and water. It is capable of producing following works:

  • Maintenance and cleaning of waterways, lakes, shorelines, ponds, etc.
  • Erosion control and prevention.
  • Deepening of waterways and river deltas.
  • Maintenance and repair of natural environment.
  • Flood protection and flood maintenance works.
  • Landscape building and protection.
  • Accessing difficult strands of water/soft terrain.
  • Swamp and wetland construction.

Technical characteristics

Currently model line of amphibious excavator “SWAMPKING” consists of 10 basic models starting from SK150SD to SK400SD-2 for excavators with weight from 6 to 40 tonns.

Pontoon dimensions (m): from 6.64×1.3×1.42 to 11.4×1.800×1.913 (length × weight × high).

“SWAMPKING” may be mounted with hydraulic system which allows each pontoon to retract or extend outward for the purposes of comfortable transportation and ability to start works as soon as possible.

Engines used are “Yammar”, “Isuzu”, “Cummins”. Hydraulic engines are “Doosan” and “Kawasaki”.

Boom length (m): from 9 to 19.
Bucket capacity (m3): from 0.2 to 2.
Machine depth working capacity (without additional pontoons): 1.1–1.7 m.
Machine depth working capacity (with additional pontoons) — up to 9 m.

In addition, “SWAMPKING” may be equipped with following attachments:

  • Soil pumps
  • Boom
  • Sorting grapples
  • Shaker
  • Scissors
  • Large variety of buckets
  • Other necessary equipment and options

Apart from mentioned above we are always open to produce pontoons on your personal preference. We are also capable of producing other special equipment and floating pontoons.

 

Advantages of “SWAMPKING”

  1. Upper structure rotation ability of 360 degrees without the loose of balance.
  2. Pontoons are produced from highly-strong steel Cor-ten.
  3. Easy transportation of even one of the biggest excavators with low loaders may be performed without the loss of characteristics of dimension — upper structure may be dismantled in 15 minutes which saves considerably money and time.
  4. Preparatory works before each exploitation take 1.5–2 hours.
  5. Additional pontoons will allow standard excavator on caterpillar move to work in all conditions, every time of year.
  • PD3000

  • PD3000

  • SWAMPKING

  • SWAMPKING

  • SWAMPKING

  • SWAMPKING

  • SWAMPKING

  • SWAMPKING

  • SWAMPKING

  • SWAMPKING

  • SWAMPKING